Agent profile image in chat bubble
Agent profile image in chat header

Justin Humphries

Team Leader | Keller Williams | The Humphries Group | Alabama Real Estate

Agent profile image in message

or another way

SMITH LAKE, ALABAMA · HUMPHRIES GROUP AT KELLER WILLIAMS

Waterbound on Smith Lake

Explore Waterbound in Cullman County with a guide to the WaterBound declaration’s separate lakefront and lake-view building standards. Its architectural, landscape and boathouse requirements are summarized alongside the current documents a buyer should request.

What to compare in Waterbound

Lakefront versus lake-view home size, architectural approval and shoreline permissions.

MLS-reported matches for Waterbound

Explore the MLS-reported subdivision matches in our Smith Lake search area. Confirm the exact community, phase and parcel for each property.

Open this property search full screen

Listings remain supplied through our existing Brivity MLS search. Save properties, use your existing account or open a listing for its full details.

Your neighborhood questions, answered

Document summaries describe the sources reviewed. Confirm current amendments, fees and the rules for your exact lot.

The WaterBound declaration is recorded in Cullman Miscellaneous Book 262, pages 278–282, December 2, 2009. The referenced subdivision map and handwritten plat reference still need confirmation against the offered parcel.

Is there an HOA, and what does it cost?

Confirm current terms

The document describes annual, special and individual assessments. Request the current annual amount, special-assessment notices and lot payment status.

WaterBound declaration · §28 · Miscellaneous Book 262, pp. 281–282 · PDF page 4

What neighborhood amenities are available?

Not verified

Current shared facilities and any ramp, dock or slip access included with the offered lot have not been verified.

WaterBound declaration · Current documents or property-specific confirmation not yet reviewed.

What size home can I build?

Document summary

The reviewed declaration specifies 2,000 heated/cooled square feet for lakefront lots and 1,600 for lake-view lots, excluding the listed nonliving spaces. A two-story residence separately needs at least 1,200 square feet on its main level. Confirm the offered lot's classification and current amendments.

WaterBound declaration · §4 · Miscellaneous Book 262, p. 279 · PDF page 2

What styles and plans need approval?

Document summary

Construction and clearing/landscaping plans require committee review under the declaration.

WaterBound declaration · §3 · Miscellaneous Book 262, pp. 278–279 · PDF page 1

Are manufactured or mobile homes allowed?

Document summary

The copy excludes mobile and modular homes. Confirm the classification of any proposed manufactured or other prefabricated construction under the complete current documents.

WaterBound declaration · §4 · Miscellaneous Book 262, p. 279 · PDF page 2

Can I keep or stay in an RV or camper?

Document summary

The declaration restricts motorhome, camper, trailer and listed equipment parking/storage to a committee-approved designated area, subject to its transport exception. Listed temporary structures are separately prohibited as residences. Confirm the proposed storage or overnight use under current documents.

WaterBound declaration · §6 · Miscellaneous Book 262, p. 279; §13 · p. 280 · PDF page 3

When must construction start?

Confirm current terms

No deadline to begin building after purchase is stated in the fully read 2009 declaration. Its 12-month/one-year provisions measure completion from the start of work. Confirm later amendments and lot-specific requirements.

WaterBound declaration · Complete 2009 declaration; §§8 and 19 · Miscellaneous Book 262, p. 280 · PDF page 3

When must construction finish?

Document summary

The declaration bars an unfinished building exterior beyond 12 months after construction begins. It also requires the house exterior, driveway and landscaping to finish on or before one year from commencement. Confirm current amendments and approval conditions.

WaterBound declaration · §§8 and 19 · Miscellaneous Book 262, p. 280 · PDF page 3

Can I rent through Airbnb or VRBO?

Confirm current terms

No minimum lease duration or express Airbnb/VRBO approval is stated in the fully read 2009 declaration. A reference to rental signs does not establish rental permission. Obtain current amendments and association rules for the property.

WaterBound declaration · Complete 2009 declaration; §9 · Miscellaneous Book 262, p. 280 · PDF page 3

What other rules should I know?

Document summary

Boathouses require committee and Alabama Power approval; the offered lot needs its own documented shoreline permissions.

WaterBound declaration · §§20 and 24 · Miscellaneous Book 262, pp. 280–281 · PDF page 4

All five supplied pages were reviewed, including the home-size, parking, construction-completion, assessment and annexation clauses. Current amendments, the exact plat reference, current association charges and individual shoreline permissions remain unverified. Historical utility prices and supplier provisions are not current service guarantees. Research checked 2026-10-31.

Building and ownership notes

The available document copies state:

Recorded document trail

Questions for the exact property

Sources, document scope and review dates

Document summaries preserve the source’s stated scope. Current amendments and the requirements for your exact lot still need confirmation.

Understand the map and the property

Community pins identify reference locations, not entrances or subdivision boundaries. A highlighted tax parcel is the selected listing’s map reference and may not include all land offered for sale. Nearby parcels are not assumed to be part of the community or listing. Confirm boundaries, access and rights with recorded documents and a survey.

Find your place on Smith Lake

Tell our team about your plans, your preferred area and the properties you want to compare.

Talk with our teamExplore Smith Lake property