Agent profile image in chat bubble
Agent profile image in chat header

Justin Humphries

Team Leader | Keller Williams | The Humphries Group | Alabama Real Estate

Agent profile image in message

or another way

SMITH LAKE, ALABAMA · HUMPHRIES GROUP AT KELLER WILLIAMS

The Preserve on Smith Lake

Explore The Preserve listings in Walker County and review the original covenants for Lots 1–11. The original document has specific home-size and building provisions, while later additions and phases need separate confirmation.

What to compare in The Preserve

Original Lots 1–11, home size, construction completion and lot-specific septic planning.

MLS-reported matches for The Preserve

Explore the MLS-reported subdivision matches in our Smith Lake search area. Confirm the exact community, phase and parcel for each property.

Open this property search full screen

Listings remain supplied through our existing Brivity MLS search. Save properties, use your existing account or open a listing for its full details.

Your neighborhood questions, answered

Document summaries describe the sources reviewed. Confirm current amendments, fees and the rules for your exact lot.

The original 1999 covenants identify Lots 1–11 on Map Book 8, page 135 and are stamped Walker DML Book 1619, pages 271–278. The packet also includes Phase Three incorporation at DML 1967, pages 274–275 and its plat at Map Book 9, page 68. Original-lot rules below are not extended to all phases without the referenced amendments.

Is there an HOA, and what does it cost?

Not verified

Current association status, annual dues and special assessments have not been established for the offered phase and lot.

The Preserve original covenants · Current documents or property-specific confirmation not yet reviewed.

What neighborhood amenities are available?

Not verified

Shared facilities and current access or maintenance rights have not been verified for the offered lot or phase.

The Preserve original covenants · Current documents or property-specific confirmation not yet reviewed.

What size home can I build?

Document summary

For the original covered lots, a one-story home requires 2,000 square feet; a two-story home requires 2,400, including 1,800 on the main level. Heated/air-conditioned area excludes porches, garages, basements and attics.

The Preserve original covenants · Original Lots 1–11 · §2(c) · Book 1619, p. 272 · PDF page 2

What styles and plans need approval?

Not verified

The complete supplied original has building, site and material requirements, including on-site construction of the primary dwelling. A general current architectural-committee approval process was not established; obtain the two referenced amendments and phase-specific documents.

The Preserve original covenants · Original §3(c) · DML Book 1619, p. 275; Phase Three references · DML 1967, p. 274 · PDF page 5
The Preserve Phase Three incorporation and plat · Original §3(c) · DML Book 1619, p. 275; Phase Three references · DML 1967, p. 274 · PDF page 5

Are manufactured or mobile homes allowed?

Document summary

The original Lots 1–11 copy excludes mobile, manufactured and prebuilt structures. This summary does not apply that rule to unreviewed later phases.

The Preserve original covenants · Original Lots 1–11 · §2(h) · Book 1619, p. 273 · PDF page 3

Can I keep or stay in an RV or camper?

Document summary

For the original covered lots, campers and listed temporary structures may not be used as temporary or permanent residences.

The Preserve original covenants · Original Lots 1–11 · §2(i) · Book 1619, p. 273 · PDF page 3

When must construction start?

Not verified

No purchase-to-start deadline was found in the supplied original or Phase Three incorporation. The original 12-month clause concerns completion after work starts. Two referenced amendments are missing.

The Preserve original covenants · Original §2(j) · DML Book 1619, p. 273; Phase Three · DML 1967, p. 274 · PDF page 3
The Preserve Phase Three incorporation and plat · Original §2(j) · DML Book 1619, p. 273; Phase Three · DML 1967, p. 274 · PDF page 3

When must construction finish?

Document summary

The original copy requires diligent, continuous construction and completion within 12 months once work begins.

The Preserve original covenants · Original Lots 1–11 · §2(j) · Book 1619, p. 273 · PDF page 3

Can I rent through Airbnb or VRBO?

Not verified

The supplied original and Phase Three incorporation do not give a numerical rental minimum or complete Airbnb/VRBO conditions. Two expressly referenced amendments are absent, so current phase-specific permission remains unverified.

The Preserve original covenants · Complete supplied packet; Phase Three references · DML Book 1967, p. 274 · PDF page 10
The Preserve Phase Three incorporation and plat · Complete supplied packet; Phase Three references · DML Book 1967, p. 274 · PDF page 10

What other rules should I know?

Document summary

The original covered lots require locally accepted septic arrangements and prohibit sewage runoff onto neighboring property or into the lake.

The Preserve original covenants · Original Lots 1–11 · §2(k) · Book 1619, p. 274 · PDF page 4

All 12 supplied pages were visually read, including a duplicate original signature page and Phase Three material. Phase Three expressly cites amendments at DML 1628, page 58 and DML 1658, page 643, whose text is absent. Its original reference says DML 1619, page 291, while this supplied original is stamped pages 271–278; official reconciliation is still needed. Research checked 2026-10-31.

Building and ownership notes

The available document copies state:

Recorded document trail

Questions for the exact property

Sources, document scope and review dates

Document summaries preserve the source’s stated scope. Current amendments and the requirements for your exact lot still need confirmation.

Understand the map and the property

Community pins identify reference locations, not entrances or subdivision boundaries. A highlighted tax parcel is the selected listing’s map reference and may not include all land offered for sale. Nearby parcels are not assumed to be part of the community or listing. Confirm boundaries, access and rights with recorded documents and a survey.

Find your place on Smith Lake

Tell our team about your plans, your preferred area and the properties you want to compare.

Talk with our teamExplore Smith Lake property