Agent profile image in chat bubble
Agent profile image in chat header

Justin Humphries

Team Leader | Keller Williams | The Humphries Group | Alabama Real Estate

Agent profile image in message

or another way

SMITH LAKE, ALABAMA · HUMPHRIES GROUP AT KELLER WILLIAMS

Hidden Falls on Smith Lake

Compare Hidden Falls listings in Winston County with a source-qualified look at the Phase I declaration. Its architectural review, home-size and construction provisions are summarized for that documented phase; other phases require their own records.

What to compare in Hidden Falls

Phase I building requirements, architectural approval and shoreline approvals.

MLS-reported matches for Hidden Falls

Explore the MLS-reported subdivision matches in our Smith Lake search area. Confirm the exact community, phase and parcel for each property.

Open this property search full screen

Listings remain supplied through our existing Brivity MLS search. Save properties, use your existing account or open a listing for its full details.

Your neighborhood questions, answered

Document summaries describe the sources reviewed. Confirm current amendments, fees and the rules for your exact lot.

The complete Phase I declaration, Winston instrument 60070, Deeds Book 264, pages 934–950, executed June 7 and recorded June 8, 2006, identifies Lots 1–72 on Plat Book 3, page 132. A 2015 instrument transfers Phase I/common-area control to the association. A separate Phase III “The Retreat” authority transfer refers to its own unread declaration; Phase I rules are not extended to it.

Is there an HOA, and what does it cost?

Confirm current terms

Phase I ownership carries association membership and annual/special assessments. The 2015 record transfers subdivision/common-area control to the association; the original historical amounts do not establish today’s dues or review fees. Obtain the current budget, specials and lot-account statement.

Hidden Falls Phase I recorded declaration · §§5.1–5.6 · Deeds Book 264, pp. 941–942; Phase I transfer · Deeds Book 313, pp. 727–729 · PDF page 8
Hidden Falls Phase I authority transfer · §§5.1–5.6 · Deeds Book 264, pp. 941–942; Phase I transfer · Deeds Book 313, pp. 727–729 · PDF page 8

What neighborhood amenities are available?

Confirm current terms

Phase I Exhibit C designates a park and playground on Lots 26 and 51. Access to a dock on Lot 52 is conditional on Alabama Power Shoreline Management approval. Current operation, approvals and the offered lot’s rights need confirmation.

Hidden Falls Phase I recorded declaration · Exhibit C · Deeds Book 264, p. 950 · PDF page 17

What size home can I build?

Document summary

For Phase I, the declaration specifies 1,700 square feet above ground; a multistory home requires at least 1,500 square feet on the first above-ground level, excluding porches, carports and garages.

Hidden Falls Phase I recorded declaration · Phase I §2.5 · Deeds Book 264, p. 936 · PDF page 3

What styles and plans need approval?

Document summary

Written architectural approval applies before improvements, landscaping, grading, excavation and specified changes. Plans, site/topography and exterior details must be submitted; written variances are available under the stated conditions. Obtain the current committee’s submission rules.

Hidden Falls Phase I recorded declaration · Phase I §§3.1–3.5 · Deeds Book 264, pp. 939–940 · PDF page 6

Are manufactured or mobile homes allowed?

Document summary

The Phase I copy excludes manufactured, modular and listed temporary structures as residences. Its applicability to another phase is not established.

Hidden Falls Phase I recorded declaration · Phase I §§2.7(c) and 2.15 · Deeds Book 264, pp. 937–938 · PDF page 4

Can I keep or stay in an RV or camper?

Document summary

The Phase I copy regulates garage parking of RVs, boats and trailers and bars listed temporary structures as residences. Confirm the exact storage proposal with the current committee.

Hidden Falls Phase I recorded declaration · Phase I §§2.13 and 2.15 · Deeds Book 264, p. 938 · PDF page 5

When must construction start?

Not verified

No deadline to begin building after purchase was found in the complete Phase I declaration or the three later instruments reviewed. Approval is still required before work; the 18-month clause is a completion period measured from commencement. Check current architectural rules and later changes.

Hidden Falls Phase I recorded declaration · Complete original · Deeds Book 264, pp. 934–950; construction §§2.3,3.1 · pp. 936 and 939; later instruments 134007,136709,144298 · PDF page 3

When must construction finish?

Document summary

For Phase I, dwelling construction, including landscaping, must finish within 18 months from commencement unless prior written architectural approval provides otherwise.

Hidden Falls Phase I recorded declaration · Phase I §2.3 · Deeds Book 264, p. 936 · PDF page 3

Can I rent through Airbnb or VRBO?

Not verified

No numerical lease minimum or express short-term rental approval/prohibition was found in the complete Phase I declaration. Residential-use wording and references to property being leased do not establish current Airbnb/VRBO permission. The later authority transfers and notice do not add a rental term; obtain current bylaws, rules and amendments.

Hidden Falls Phase I recorded declaration · Complete Phase I declaration · Deeds Book 264, pp. 934–950; residential use §2.4 · p. 936; later instruments 134007,136709,144298 · PDF page 3

What other rules should I know?

Document summary

Phase I shoreline and pier/boathouse provisions require compliance with applicable Alabama Power requirements. A waterfront lot alone does not establish a permit entitlement.

Hidden Falls Phase I recorded declaration · Phase I §§2.6(c) and 2.18 · Deeds Book 264, pp. 937–939 · PDF page 4

All 17 original official-preview pages and all seven pages of the three identified later instruments were visually read. The original’s former internal page gaps are now filled. The later documents transfer authority or provide an association notice; they do not supply new general building or rental terms. Current bylaws, architectural rules, later amendments, current charges and exact-lot applicability still need confirmation; the reduced plat’s fine survey details were not used. Research checked 2026-10-31.

Neighborhood features

Building and ownership notes

The available document copies state:

Recorded document trail

Questions for the exact property

Sources, document scope and review dates

Document summaries preserve the source’s stated scope. Current amendments and the requirements for your exact lot still need confirmation.

Understand the map and the property

Community pins identify reference locations, not entrances or subdivision boundaries. A highlighted tax parcel is the selected listing’s map reference and may not include all land offered for sale. Nearby parcels are not assumed to be part of the community or listing. Confirm boundaries, access and rights with recorded documents and a survey.

Find your place on Smith Lake

Tell our team about your plans, your preferred area and the properties you want to compare.

Talk with our teamExplore Smith Lake property